    北京pk赛车属于什么彩:项目管理&系统工程过程
    (PM & SE Process)

    LSIS, as a consortium leader, designs and provides the most appropriate system in all the stages from project planning to testing, commissioning and maintenance. At the same time, LSIS offers highly reliable project performance. From Macro Main Line to Metro From High Speed Railway to Light Rail Transit

    • Features
    • Comparison of Process
    • Project Management
    • System engineering
    • 下载
    • 客户支持

    Features

    For large-scale railway infrastructure implementation projects that require large capital investment and long construction period, LSIS provides the following solutions to developers and engineering service providers for the integrated E&M projects.

    • - Integrated Management of Project Schedule, Reducing Construction Period
    • - Lowering Various Technical Risks
    • - Drastically Reducing Project Operation Personnel
    • - Decreasing Project Cost

    Comparison of Process

    Project Execution : E&M Turnkey (LSIS Do)

    PMSEProcess-s1.gif

    Project Execution : Separate Order Individual System

    PMSEProcess-s2.gif

    Project Management

    Through systematic and integrated management of various business fields, LSIS guarantees successful E&M system.

    • - The most Comprehensive Concept
    • - Including All of Legal, Financial and Technical Aspects of Contract

    PMSEProcess-s3.gif

    System engineering

    This is a large-scale composite system of diverse interfaces with outside organizations and participation by various fields that requires systemized engineering techniques.

    Due to mutual interface between subsystems and integrated system implementation, it is necessary to predict problems in advance and to establish solutions.

    Overall system assurance measures are necessary to satisfy the final requirements.

    It is necessary to minimize risks and to observe schedule by using the previously verified system and technologies applied.

    From design, manufacturing, installation and test to test operation and opening of each E&M system, systematic adjustment, control and management are provided from the viewpoint of integrated E&M system throughout the lifecycle of the system.

    Features

    For large-scale railway infrastructure implementation projects that require large capital investment and long construction period, LSIS provides the following solutions to developers and engineering service providers for the integrated E&M projects.

    • - Integrated Management of Project Schedule, Reducing Construction Period
    • - Lowering Various Technical Risks
    • - Drastically Reducing Project Operation Personnel
    • - Decreasing Project Cost

    Comparison of Process

    Project Execution : E&M Turnkey (LSIS Do)

    PMSEProcess-s1.gif

    Project Execution : Separate Order Individual System

    PMSEProcess-s2.gif

    Project Management

    Through systematic and integrated management of various business fields, LSIS guarantees successful E&M system.

    • - The most Comprehensive Concept
    • - Including All of Legal, Financial and Technical Aspects of Contract

    PMSEProcess-s3.gif

    System engineering

    This is a large-scale composite system of diverse interfaces with outside organizations and participation by various fields that requires systemized engineering techniques.

    Due to mutual interface between subsystems and integrated system implementation, it is necessary to predict problems in advance and to establish solutions.

    Overall system assurance measures are necessary to satisfy the final requirements.

    It is necessary to minimize risks and to observe schedule by using the previously verified system and technologies applied.

    From design, manufacturing, installation and test to test operation and opening of each E&M system, systematic adjustment, control and management are provided from the viewpoint of integrated E&M system throughout the lifecycle of the system.

    下载

    主题 分类 语言 修改日期

    客户支持

    常见问题 more
    联系我们 more
    top
  • 辛鸣:习近平新时代中国特色社会主义思想是马克思主义中国化的最新成果 2019-03-24
  • 中方有力回击!美国多个行业喊痛:“加征关税就是对美国消费者征税” 2019-03-24
  • 中国电信安康分公司60家智慧家庭便民服务中心盛大开业中国电信安康-最新活动 2019-03-22
  • 谁在鼓噪智能音箱? 风眼 2019-03-19
  • 将“最多跑一次”改革进行到底 2019-03-14
  • 上海电影节在线影展让你足不出户尽享佳片 2019-03-14
  • 最高法发布互联网公开审判流程信息规定 9月1日起施行 2019-03-13
  • 人民网评:核心技术是强国之匙 2019-03-13
  • 庆祝人民日报创刊70周年系列访谈之温宪 2019-03-12
  • 周杰伦昆凌为儿子庆生 小小周帅气入镜 2019-03-12
  • 辽宁省面向全国招募女性人才及创新创业项目 2019-03-10
  • 苔花如米小,也学牡丹开 2019-03-09