• 辛鸣:习近平新时代中国特色社会主义思想是马克思主义中国化的最新成果 2019-03-24
  • 中方有力回击!美国多个行业喊痛:“加征关税就是对美国消费者征税” 2019-03-24
  • 中国电信安康分公司60家智慧家庭便民服务中心盛大开业中国电信安康-最新活动 2019-03-22
  • 谁在鼓噪智能音箱? 风眼 2019-03-19
  • 将“最多跑一次”改革进行到底 2019-03-14
  • 上海电影节在线影展让你足不出户尽享佳片 2019-03-14
  • 最高法发布互联网公开审判流程信息规定 9月1日起施行 2019-03-13
  • 人民网评:核心技术是强国之匙 2019-03-13
  • 庆祝人民日报创刊70周年系列访谈之温宪 2019-03-12
  • 周杰伦昆凌为儿子庆生 小小周帅气入镜 2019-03-12
  • 辽宁省面向全国招募女性人才及创新创业项目 2019-03-10
  • 苔花如米小,也学牡丹开 2019-03-09
  • product thumbnail

    北京pk10八码公式教程:项目案例
    (Reference)

    “Further Evolved “Ubiquity on the Road” With faster, more accurate information, LSIS’ high-tech freeway traffic management system facilitates safe driving and efficient communication on the freeway.

    • Main Line
    • Metro Line
    • 下载
    • 客户支持

    Main Line

    Kyungbu High Speed Railway

    • - HSR Signalling System
        Consortium Leader[Phase 2 of Kyungbu HSR Project
        Automatic Train Control System[ATC, Onbroad & Wayside Systems]
        Train Traffic Management System[TMS]
        System Engineering
        Safety Facilities
    • - HSR Phase 2 CTC Implementation
         Localized and Implemented CTC for HSR Phase 2
         Primary Backup Railway traffic Control Centers
    • - HSR Electrical System

    Reference-s1.jpg

    Metro Line

    Seoul Metro Phase 1 Line 3 & 4

    • - CTC, Control Facility
    • - Electrical Power System Facility:
        7 DC Substation (Line 3)
        5 DC Substation (Line 4)

    Reference-s2.jpg

    Seoul Metro Phase 2 Line 6

    • - CTC, Control Facility
    • - Signalling
    • - Electrical Power System Facility: 12 DC Substation

    Reference-s3.jpg

    Line 7 & 8

    • - CTC, Control Facility
    • - Electrical Power System Facility: 11 DC Substation

    Reference-s4.jpg

    Busan Line 1 & 2

    • - Signalling, TTC, ATC, Simulation System

    Reference-s5.jpg

    Incheon Line 1

    • - Electrical Power System Facility: 10 DC Substation

    Reference-s6.jpg

    Daegu Line 1 & 2

    • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

    Reference-s7.jpg

    LRT

    Incheon International Airport Shuttle Train

    E&M Work

    • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
    • - System as a Consortium Leader
    • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
    • - LSIS Delivered and Performed
        Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
        Communication System
        Platform Screen Doors
        1st Unmanned LRT in Korea

    Incheon Line 2

    E&M Consortium

    • - 12 Substations
    • - 6 Energy Storages
    • - SCADA
    • - Electric Work
    • - 27 stations. PSD

    Gwangmyoung

    E&M Works

    • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
    • - Except for civil / architectural works
    • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
    • - Sub-system engineering services to implement independent systems & Integration
    • - Providing total engineering services for train operation system.

    Overseas

    Thailand ST1 & ST4

    • - ST1 Signaling & Communication System
         CTC : 52 Station
         CIC: 14 Station
         Block System: 14 Sets
         Level crossing: 32 Sets
         Switch: 127 Sets
         Track Circuit: 150 Sets
         Signaling Device: 342 Sets
    • - ST4 Signaling & Communication System
         CTC : 7 Station
         CBI: 7 Station ( LS-EIS520V)
         Block System: 7 Sets
         Communication System: 7 Sets
         Switch: 92 Sets
         Track Circuit: 357 Sets
         Signaling Device: 131 Sets
         Power Supply: 7 Sets

    Reference-s8.jpg

    Main Line

    Kyungbu High Speed Railway

    • - HSR Signalling System
        Consortium Leader[Phase 2 of Kyungbu HSR Project
        Automatic Train Control System[ATC, Onbroad & Wayside Systems]
        Train Traffic Management System[TMS]
        System Engineering
        Safety Facilities
    • - HSR Phase 2 CTC Implementation
         Localized and Implemented CTC for HSR Phase 2
         Primary Backup Railway traffic Control Centers
    • - HSR Electrical System

    Reference-s1.jpg

    Metro Line

    Seoul Metro Phase 1 Line 3 & 4

    • - CTC, Control Facility
    • - Electrical Power System Facility:
        7 DC Substation (Line 3)
        5 DC Substation (Line 4)

    Reference-s2.jpg

    Seoul Metro Phase 2 Line 6

    • - CTC, Control Facility
    • - Signalling
    • - Electrical Power System Facility: 12 DC Substation

    Reference-s3.jpg

    Line 7 & 8

    • - CTC, Control Facility
    • - Electrical Power System Facility: 11 DC Substation

    Reference-s4.jpg

    Busan Line 1 & 2

    • - Signalling, TTC, ATC, Simulation System

    Reference-s5.jpg

    Incheon Line 1

    • - Electrical Power System Facility: 10 DC Substation

    Reference-s6.jpg

    Daegu Line 1 & 2

    • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

    Reference-s7.jpg

    LRT

    Incheon International Airport Shuttle Train

    E&M Work

    • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
    • - System as a Consortium Leader
    • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
    • - LSIS Delivered and Performed
        Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
        Communication System
        Platform Screen Doors
        1st Unmanned LRT in Korea

    Incheon Line 2

    E&M Consortium

    • - 12 Substations
    • - 6 Energy Storages
    • - SCADA
    • - Electric Work
    • - 27 stations. PSD

    Gwangmyoung

    E&M Works

    • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
    • - Except for civil / architectural works
    • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
    • - Sub-system engineering services to implement independent systems & Integration
    • - Providing total engineering services for train operation system.

    Overseas

    Thailand ST1 & ST4

    • - ST1 Signaling & Communication System
         CTC : 52 Station
         CIC: 14 Station
         Block System: 14 Sets
         Level crossing: 32 Sets
         Switch: 127 Sets
         Track Circuit: 150 Sets
         Signaling Device: 342 Sets
    • - ST4 Signaling & Communication System
         CTC : 7 Station
         CBI: 7 Station ( LS-EIS520V)
         Block System: 7 Sets
         Communication System: 7 Sets
         Switch: 92 Sets
         Track Circuit: 357 Sets
         Signaling Device: 131 Sets
         Power Supply: 7 Sets

    Reference-s8.jpg

    下载

    主题 分类 语言 修改日期

    客户支持

    常见问题 more
    联系我们 more
    top
  • 辛鸣:习近平新时代中国特色社会主义思想是马克思主义中国化的最新成果 2019-03-24
  • 中方有力回击!美国多个行业喊痛:“加征关税就是对美国消费者征税” 2019-03-24
  • 中国电信安康分公司60家智慧家庭便民服务中心盛大开业中国电信安康-最新活动 2019-03-22
  • 谁在鼓噪智能音箱? 风眼 2019-03-19
  • 将“最多跑一次”改革进行到底 2019-03-14
  • 上海电影节在线影展让你足不出户尽享佳片 2019-03-14
  • 最高法发布互联网公开审判流程信息规定 9月1日起施行 2019-03-13
  • 人民网评:核心技术是强国之匙 2019-03-13
  • 庆祝人民日报创刊70周年系列访谈之温宪 2019-03-12
  • 周杰伦昆凌为儿子庆生 小小周帅气入镜 2019-03-12
  • 辽宁省面向全国招募女性人才及创新创业项目 2019-03-10
  • 苔花如米小,也学牡丹开 2019-03-09